Week 23, 24, 25: Catchup.
Week 23: Trimmy-trim-trim.

Monday. Trim.
Tuesday (July 4th). Trim.
Wednesday. Trim. Pocket door frame.
Thursday. Trim. Pocket door drywall.
Friday. Dumpster is gone.
Saturday. Cabinet guy quits.
Sunday. Re-install most of the cabinets.
Week 24: Hold the baby, I’m opening a can of woop-ass and I need both hands!

Monday. Front part of the deck is done. Paint.
Tuesday. Side part of the deck is done.
Wednesday. Railing issues, Electritian doesn’t show up. Paint prep. Interior door knobs are here.
Thursday. Electrician shows up, does nothing. Paint prep.
Friday. Can o’ Whoop-ass, long story, later. Electrician shows up again, does nothing. Paint primer. Water Heater and AC are installed.
Saturday. Nothing
Sunday. Ron and I install cabinets, doors and drawers.
Week 25: Electrician? Electrician?

Monday. Another coat of primer. Electrician shows up, half installs one fan, and puts a trim kit in the wrong place. We start packing to move.
Tuesday. Paint trim with gloss white. We buy Microhood and refrigerator. Still packing. Trying to decide what railing to put in stairs and deck. Rejuvenation order arrives, short 2 lights and 1 shade.
Wednesday. Railing arrived, painters finished up. I went on a rampage and stuck blue post-its to everything that was not finished. I wrote a list everything that was not finished and gave it to Jimmy. New tub was installed.
Thursday. Ron and I installed the microhood. Countertops were installed. Jimmy fixed the outlets on the bar just in time. Shelf by the tub in the master bath was built, and apron was put on the tub. The apron gives is something of a 50s look, but the tub is so huge, we are going to look like miniature 50s people bathing in it. Thermostats were installed. refrigerator arrived, we will need to remove the baseboards (like, I so told you so) and rub butter on both sides to fit it in that space. Jimmy eats a lot of shark.
Friday. Posts for the railing on the deck were installed, but not the railing. Vent covers were installed (except for the hall and master bedroom, and the land was graded for the AC condensers. Our stove was delivered. No sign of an electrician. Jimmy took the afternoon off to go fishing in the gulf.
Saturday. I put in the last of the cabinet fronts, and one of the shades for the kitchen lights (the other should arrive Wednesday). I changed the way the corner cabinet door swings.