• Our Story
  • Gallery
    • Before
    • After (2011)
  • Contact
  • Press
  • About

May
29
2006
 1

Week 17 Wrap-up: The Waiting is the Hardest Part


Misleading title. Actually waiting for the baby is the hardest part. The house has been progressing so swiftly it’s making our heads spin.
Monday. Prep for drywall and dry wall in the downstairs bathroom. We last minute redesigned the master bathroom. Christiane wants to put a piece of furniture where one of the sinks was going to be. I still haven’t made my peace with it.
bathmock.jpg
I had a talk with Ace and he gave the supervisor six weeks to finish the job. That puts the finish date at June 30, two days past the one I picked last summer when we got this project started, and a day after Christiane’s birthday, which I promised to celebrate on the deck. I’ll be starting the kitchen on Thursday this week, unless we have a brand new baby. If that happens on Thursday, then I just don’t know what.
Tuesday. More drywall prep.
Wednesday. They darn near dry walled the whole house. I think they were there from 7:30am to 7:30pm.
Thursday. They finished hanging drywall. Mainly the master suite and the utility closet. Taped and floated most of it. Christiane went into something indistinguishable from labor but not really labor because we still don’t have a baby.
Friday. Finished taping a floating. There is an amazing amount of white powder and mud on the floor. We better pick out some gol-dang paint colors.
Having the drywall in, it’s much easier to see what we designed. The ceiling in the master bedroom is a good bit higher feeling than I thought. The dining room and kitchen has a great, just-complex-enough look. It also became plainly obvious that when they swapped the position of the toilet and sink in the kid’s bathroom, they did not change the position of the light over the sink. So we have a light over the toilet, and I guess, a cabinet over the sink. Hope that’s easy to fix.

Comment for Week 17 Wrap-up: The Waiting is the Hardest Part


Leah
June 1, 2006, 4:07 pm

Perhaps you will feel better about the furniture taking over the second sink position if you put in the rough plumbing for a second sink anyway, so the area is ready for a second sink should you ever both come to the decision that that’s what you really want instead…




  • Popular Posts

    • Come On Down!!!
      You're the next contestant on the Erwin House Guess Our Massive August Electric...
    • Flipping Out
      Technically speaking, I am not against flipping. David and I have posted about it before,...
    • Happy Father's Day Indeed!
      Baby Erwin was born at home, 4:27am Saturday June 17th, 2006. 8 pounds 3 ounces (give...
  • Tags

    "erwin house " gardening 50's 1950's activity room austin Buddy Holly california modern cliff may concrete block den draught fence fender game room green housing Kerrville Folk Festival Landscaping living room long beach lucite mid-century mid-century modern moe mortgages music Our Story palette Picture of the Day rancho style refinishing renovating retractable lamp retractable light retro rhodes Sherwin Williams siemens stereo cabinet suburbia victory garden vintage Willie Nelson wood xeriscaping





All content, text and images Copyright © 2005-2011 Christiane and David Erwin